Skip to main content
The standard usage scenario includes the following stages. For best results, process documents at User Type (ID=2000) stages. Create these stages on the Workflow tab of the Project Properties dialog box in Advanced mode. When connecting, use the External User (ID=12) role and the External Station (ID=10) station type. For tasks at these stages, both pre-processing and post-processing always run, regardless of the stage type specified when calling the CloseTask method. For other stages, post-processing runs only if a stage of the required type is specified, for example Verification Postprocessing. During pre-processing, XML files that describe the documents of the task are created. Upload these documents using a POST request, make the necessary changes, save them on the server, and then close the task with the CloseTask method. During post-processing, the information from the XML files that describe the documents is saved in the ABBYY FlexiCapture database.